Services
Cabinets and counters
A new face for a kitchen whose layout already works.
When the sink, range and refrigerator are where you want them, new cabinets and counters change the room without moving a pipe. We measure counters after the cabinets are set so the fit is exact.
What's included
Cabinet boxes, doors and drawers
Counters in stone, quartz, wood or laminate
New sink, faucet and disposal
Backsplash and lighting under the cabinets
Hardware, trim and a paint touch-up

Cost
What changes the cost
No figure here, because the room sets it. These are the things that move it.
Cabinet type
Stock, semi-custom and shop-built.
Counter material
And how much of it, with seams.
The sink
An undermount sink needs a stone or solid top.
Wall repairs
Old cabinets leave marks that need patching.
How it goes
The work, in order
- 01
Step 1: Measure
Cabinet runs, appliances and windows.
- 02
Step 2: Select
Door style, finish and counter material.
- 03
Step 3: Order
Cabinets arrive; counters wait for their measurements.
- 04
Step 4: Install
Cabinets set level, counters templated and fitted.
- 05
Step 5: Finish
Backsplash, hardware and a walk-through.
Questions about this work
Can you reuse my cabinet boxes?
Sometimes, if they are sound and the layout stays. We look at them at the design meeting.
Why measure counters after the cabinets?
Cabinets move a quarter inch when they're set. A template taken afterward fits.
Start with the worksheet
Answer what you can. We'll help with the rest.